Extruded-Sidewall Concrete Faced Rockfill Dam (CFRD)

Sand Dams & Civil Works • Est. CapEx: $900,000 USD • Lifespan: 20 Years (Standardized)


Technical Overview

A construction-method innovation for concrete faced rockfill dams that replaces traditional cushion over-filling, slope leveling, and sand blasting with an extruded rapid-setting sidewall. It streamlines the upstream face preparation before concrete slab placement.


Key Specifications & Engineering Parameters

Parameter Specification
Category Sand Dams & Civil Works
Capital Cost (CapEx) $900,000 USD
Power / Energy Electric / Motorized
Target Scale Community Scale
Standard Lifespan 20 Years (Standardized)
Technology Maturity Field Tested
Primary Mechanism A rapid-setting, low elastic modulus material is extruded in thin layers along the upstream dam axis to build the sidewall. This semi-elastic layer sits between the rockfill embankment and the concrete face slab, absorbing differential settlement and eliminating the need to trim over-placed cushion material to a precise slope.

Cross-Reference & Interactive Tools

Need to evaluate this technology for your specific field site? Run the WhatWater.info Selector Engine to compare it against 100+ alternative solutions.